Vision 3:20
"Now to him who is able to do above and beyond all that we ask or think according to the power that works in us—to him be glory in the church and in Christ Jesus to all generations, forever and ever. Amen.” Ephesians 3:20-21
Phase One
1. Re-name the building fund the Vision 3:20 Fund
All expenses of this campaign will come from this fund.
2. Conduct a property survey
The Long-Range Planning Committee will secure this without requiring further church approval.
3. Enlist a temporary committee to get rid of all unnecessary clutter throughout the entire church property and update our storage space to maximize organization and efficiency.
This committee will be selected by the Nominating Committee without requiring further church approval. This committee will consult with other committees and ministry leaders as needed.
4. Transition the library into a Discipleship Resources Library only. These resources will be boxed up and stored until a suitable library location is determined. (Library Committee)
5. Upstairs bathroom renovation.
The Building and Grounds Committee will consult with the Long-Range Planning Committee before the final project is presented for church approval.
6. Updates with landscaping and other exterior work. (signage, lighting, etc.)
The Building and Grounds Committee will work alongside the Long-Range Planning Committee for these projects.
Any individual project with an estimated cost of over $1,000.00 will require church approval.
7. Evaluation and Renovation of SS space. (LRP, SS Director, B/G; church approval needed)
This will include a designated overflow room.
8. New kitchen equipment and renovation. (Kitchen Comm., B/G; church approval needed)
Click Below to Give to Vision 3:20
(Select Vision 3:20 (Building/Construction Fund from the drop-down)