Vision 3:20

  "Now to him who is able to do above and beyond all that we ask or think according to the power that works in us—to him be glory in the church and in Christ Jesus to all generations, forever and ever. Amen.” Ephesians 3:20-21


Phase One


    1. Re-name the building fund the Vision 3:20 Fund


    2. Conduct a property survey


    3. Enlist a temporary committee to get rid of all unnecessary clutter throughout the entire                     church property and update our storage space to maximize organization and efficiency.


    4. Transition the library into a Discipleship Resources Library only. These resources will be                     boxed up and stored until a suitable library location is determined. (Library Committee)


    5. Upstairs bathroom renovation.


     6.  Updates with landscaping and other exterior work. (signage, lighting, etc.)



     7. Evaluation and Renovation of SS space. (LRP, SS Director, B/G; church approval needed)


      8. New kitchen equipment and renovation. (Kitchen Comm., B/G; church approval needed)


Click Below to Give to Vision 3:20

(Select Vision 3:20 (Building/Construction Fund from the drop-down)